Installing Bamboo Floors on Top of a Concrete Subfloor
|
|
Time to read 3 min
|
|
Time to read 3 min
Note: THE FOLLOWING IS A GUIDELINE ONLY. CAREFULLY READ THE MANUFACTURER’S INSTALLATION INSTRUCTIONS THAT COME WITH YOUR PRODUCT BEFORE YOU INSTALL BAMBOO ON CONCRETE.
**Do not install bamboo flooring that has not been properly acclimatized to humidity conditions. Recommended acclimating time is 7 days minimum in rooms where the flooring will be installed. Try to disperse flooring as much as possible. If it is not possible, make smaller stacks, break boxes and open ends. Before starting installation, check moisture content on several randomly picked samples.